The Challenges

The Colorado Highlands wind project is located in Logan County, Colorado and utilizes 42 GE 1.6 MW turbines.  This 67 MW project now produces enough electricity to power 19,500 homes annually.

PROJECT SCOPE OF WORK

  • Foundation design and installation
  • Access roads, crane pads and walks, and laydown yards
  • 34.5/115 kV collector substation
  • 115-kV switchyard
  • Turbine erection and tower wiring
  • Operations and maintenance building
  • SCADA system
  • 115-kV transmission line

CONSTRUCTION PHOTOS

PROJECT DETAILS

Categories:
Client: Alliance Power
Location: Logan County, Colorado
Megawatts: 67

Connect

CONTACT

2647 Waterfront Parkway E. Dr. Suite 100, Indianapolis, IN 46214

(800) 355-9401

info@iea.net

Mon – Fri: 8:00 – 5:00

Ready to power forward your next project?

Project Description

Client:Alliance Power
Location:Logan County, Colorado
Megawatts:67