The Challenges

PROJECT SCOPE OF WORK

  • Engineering and construction of civil and electrical system and substation BOP
  • Construction of 15 miles of access roads and crane walk paths and associated WTG crane pads
  • Construction of state and county road intersections to accommodate WTG deliveries
  • Spread-footer foundations, poured in-place concrete construction with steel reinforcement
  • Construction of 69/34.5 kV interconnection station
  • Construction of 17 miles of underground 34.5 kV collector system
  • Interface coordination between the wind farm and Northwest Electric
  • Fiber optics communication and SCADA network
  • Tower wiring
  • Energization and testing of the collector system and interconnect with the municipal

CONSTRUCTION PHOTOS

PROJECT DETAILS

Categories:
Client: John Deere Renewables LLC
Location: Conception, Missouri
Megawatts: 50.4 MW

Connect

CONTACT

2647 Waterfront Parkway E. Dr. Suite 100, Indianapolis, IN 46214

(800) 355-9401

info@iea.net

Mon – Fri: 8:00 – 5:00

Ready to power forward your next project?

Project Description

Client:John Deere Renewables LLC
Location:Conception, Missouri
Megawatts:50.4 MW