The Challenges

PROJECT SCOPE OF WORK

  • Engineering and construction of civil, electrical, and communications system BOP
  • Subcontractor project management for execution of work
  • Construction of 2 miles of access roads, 3 acres of laydown yard, and 7,500 feet of underground collector trenches
  • 350 yard spread-footer foundations, poured in place concrete construction with steel reinforcement
  • 10,500 LF of transmission line to utility’s point of interconnect
  • 13 kV distribution line to existing substation
  • Fiber optics communication and SCADA network
  • Microwave communication system from onsite SCADA system to top of local grain elevator

CONSTRUCTION PHOTOS

PROJECT DETAILS

Categories:
Client: John Deere Wind Energy
Location: Panhandle, Texas
Megawatts: 10

Connect

CONTACT

2647 Waterfront Parkway E. Dr. Suite 100, Indianapolis, IN 46214

(800) 355-9401

info@iea.net

Mon – Fri: 8:00 – 5:00

Ready to power forward your next project?

Project Description

Client:John Deere Wind Energy
Location:Panhandle, Texas
Megawatts:10