The Challenges

The Intrepid Wind Farm was constructed by IEA Renewable Energy (formerly known as RMT) in 2004 in Sac & Buena Vista counties in Iowa.  The project consists of 107 GE 1.5 MW turbines and features a cross bonded circuit design.

PROJECT SCOPE OF WORK

  • Contractor for electrical system construction
  • Installation of underground collector system
  • Fiber optic communications
  • Internal tower wiring

CONSTRUCTION PHOTOS

PROJECT DETAILS

Categories:
Client: Mid-American Energy
Location: Storm Lake, Iowa
Megawatts: 160.5
Completed: 2004