The Challenges

In 2011 the Milford Wind Corridor project was expanded to add 68 turbines bringing an additional 102 megawatts online.  The projects now combined produce enough electricity to power 60,000 homes annually.

PROJECT SCOPE OF WORK

  • Spread-footer foundations
  • Access roads, crane pads walks and laydown yards
  • 3-phase 34.5 kV electrical collection system
  • SCADA system
  • Turbine erection and tower wiring
  • FAA lighting
  • FAA lighting and meterological tower
  • Storm water managment design

CONSTRUCTION PHOTOS

PROJECT DETAILS

Categories:
Client: First Wind
Location: Beaver & Millard Counties, Utah
Megawatts: 102