The Challenges

The Sheffield Wind Farm is located in Northern Vermont.  The 40 MW wind farm utilizes Clipper C96 and C93 turbines and now produces enough electricity to power 15,000 homes annually.

PROJECT SCOPE OF WORK

  • Storm water management
  • Spread-footer foundations
  • Access roads, crane pads and walks, and laydown yards
  • 3-phase 34.5-kV electrical collection system
  • Substation/switchyard
  • SCADA systems
  • Turbine erection and tower wiring
  • FAA lighting
  • WTG transportation to the site
  • Operations and maintenance building

CONSTRUCTION PHOTOS

PROJECT DETAILS

Categories:
Client: First Wind
Location: Sheffield, Vermont
Megawatts: 40

Connect

CONTACT

2647 Waterfront Parkway E. Dr. Suite 100, Indianapolis, IN 46214

(800) 355-9401

info@iea.net

Mon – Fri: 8:00 – 5:00

Ready to power forward your next project?

Project Description

Client:First Wind
Location:Sheffield, Vermont
Megawatts:40