Project Scope of Work:

  • 2.3 million cubic yards of mass excavation that includes both rock and dirt
  • 62,000 square yards of 10.5-inch concrete pavement
  • 42,000 tons of asphalt pavement
  • 1,000 lineal feet of precast box culverts
  • 3,000 lineal feet of precast of various diameter drainage structures
  • Four bridges, two at 750 feet in length and two at 900 feet in length, all are spanning ravines with depths of 75 feet