Project Scope of Work:

  • 1.5 million cubic yards of borrow and 500,000 cubic yards of cut to fill.
  •  The mainline pavement section is Portland Cement Concrete Pavement with a combination of both concrete and asphalt shoulders. An aggregate sub-base on subgrade supports the pavement section.
  • Project drainage features include precast concrete pipe varying in diameters from 12 to 72 inches. In addition to precast pipe, 16 precast box culverts are a part of the project drainage system.

Project Gallery